The delegation of Qinghai proposed to support the construction of renewable energy base in Hainan

to attend the twelve session of the National People’s Congress of the Qinghai delegation proposed to support the province’s Hainan Tibetan Autonomous Prefecture and Haixi Mongolian and Tibetan Autonomous Prefecture of tens of millions of kilowatts of renewable energy base construction.

pointed out that the proposal, Qinghai abundant solar energy resources, the total radiation amount after Tibet, ranking second in the country, Haixi area can be used for solar power in Gobi desert land area of 99 thousand and 600 square kilometers, and the flat open terrain, convenient traffic conditions for the comprehensive development of ranks first in the country, is the best area to build large-scale photovoltaic power plant. Since 2010, the province to give full play to the advantages of solar energy resources, comprehensive development conditions and other advantages, to promote the development of photovoltaic power generation in the scale of more than 1 million kilowatts per year. As of 2015 grid connected photovoltaic power plant installed capacity of 5 million 640 thousand kilowatts. And has completed the planning of Hainan Haixi two renewable energy base, base planning target installed capacity of 66 million kilowatts, of which thermal, photovoltaic, wind power, hydropower is respectively 3600, 1300, 850, 8 million 500 thousand kilowatts, is scheduled to be completed before 2025.

suggested that send work for the development of new energy base and two million kilowatts to promote our province, and get the advantage in the national energy resources allocation and green development in Qinghai Province, established the clean energy development, transportation is clean; and in accordance with the "unified planning, implementation, coordinate development the train of thought, carry out the construction of Hercynian, Hainan two bases, Hainan key development area, hydropower and photovoltaic pumped storage, focusing on the development of wind power, photovoltaic and thermal Haixi, pumped storage and the development of a certain size to be added. And clear Hainan, Hercynian new energy base construction and send ideas.

suggested, one is the two new energy base in Qinghai Province Planning into the national "13th Five-Year" power planning, to co-ordinate the power market, the market demand, to achieve effective convergence of energy and electric power planning, to ensure that the Qinghai new energy scale to go to send out, falling down. Two is recommended that the state of light and heat power station construction to give some preferential tariff policies, accelerate the development of thermal energy storage technology, and promote new energy enterprises to accelerate the construction of thermal power plant. Three is recommended to support the National Energy Bureau of Qinghai province to carry out the pumped storage location, the pumped storage power plant into the national "13th Five-Year" pumped storage power and energy storage planning siteplan. The four is that Middle East no longer construction of new coal-fired generating units, the power gap relying on global energy Internet trend, through the construction of UHV transmission channel, Qinghai to set aside a certain large-scale clean energy consumptive space, boost the rapid development of economy and society in Qinghai province.